Skip to content
Castleton, NY  /  Mon to Fri, 7:30am to 4:00pm
Upstate NY · VT · W. MA · CT 518.766.7676 info@total-tool.com
Home/Equipment/EV Charging
A Lynkwell EV charging station beside a tree-lined park

Equipment  /  Facility

LynkwellAuthorized dealer

EV charging.See what you qualify for.

Lynkwell Level 2 and DC fast chargers, installed by Total Tool across upstate New York, Vermont, western Massachusetts and Connecticut. Start with the incentive finder: pick your utility and see which programs could help pay for your project.

Programs change often. Every result links to the official program page.

Up to 19.2 kWLevel 2, adjustable 12–80A
LifetimeXLynk warranty with subscription
BABA compliantBuilt in New York
NY OGS contractXLynk on PC70332

Incentive finder

See what you could qualify for

Pick your state, your electric utility, who will be charging and the charger type. You will see the programs that fit, whether they are open right now, and a link to each official program page.

1. Your state

2. Your electric utility

Pick your state first.

3. Who will be charging

4. Charger type

Your programs

Last checked: October 2026
Your programs show here

Answer the four questions and the matching programs appear, each with its status and a link to the official page.

Software

ViaLynk runs the site

Every XLynk connects to ViaLynk for monitoring, pricing and access control.

  • Real-time dashboards for sessions, usage and site performance
  • Private charging, guest charging, open hours and driver discount groups
  • Pricing and access controls for fleet and workplace sites
  • 99.99% software uptime with 24/7 U.S.-based support
The ViaLynk dashboard on a laptop and the ViaLynk app on a phone

Why XLynk

Built for uptime

A charger that is down costs you the customer who came to use it. XLynk is built around staying up.

Service
Under 5 minEZ-Swap Faceplate

Fixed on site, not replaced

Common service is a faceplate swap with basic hand tools, instead of pulling and replacing the whole unit.

Power
12–80Aadjustable output

Fits the panel you have

Dynamic local load management shares available power across chargers and can reduce the need for electrical upgrades.

Coverage
Lifetimewith an active subscription

Replacement after eight years

With continuous coverage and no prior replacement, owners qualify for new hardware after eight consecutive years.

Origin
BABABuild America, Buy America

Ready for funded projects

Manufactured in New York, so it fits programs with domestic-content requirements.

Side by side

Level 2 or DC fast

Most sites need one or the other, and some need both.

Level 2DC fast
Charging timeHours: overnight, or a full workdayMinutes to an hour
Best forEmployees, overnight fleets, multifamily, longer visitsCustomer stops, quick fleet turnaround, highway sites
Power208–240V, from 12 to 80A on XLynkTypically 480V three-phase
IncentivesThe widest range of state and utility programsFewer programs, but larger amounts

The vendor

Why Total Tool backs Lynkwell

Lynkwell

A charging partner from our own territory

Lynkwell is based in Schenectady, New York, and builds the XLynk there, with engineering, software, network operations and service teams in the United States. It is now part of Nayax.

Lynkwell also offers in-house funding support to find incentive programs, and Total Tool handles the site, the installation and the local service.

Public contractsXLynk is on NY State OGS contract PC70332, Sourcewell and the Purchasing Cooperative of America.
500+ productsA curated catalog from leading charger manufacturers, plus Lynkwell's own XLynk.
EVSE-360Optional coverage for labor, shipping, accidental damage and on-site service.
24/7 supportU.S.-based support for site owners and drivers.

Why buy it here

One local team, from quote to handoff

Total Tool has equipped shops across upstate New York, Vermont, western Massachusetts and Connecticut since 1983. EV charging lives on the same panel, the same lot and the same service calls as the rest of the shop, so we plan it with everything else.

  • Incentives checked before anything is ordered
  • Panel and service capacity checked at the site visit
  • Chargers installed by our own crews
  • Activation and ViaLynk setup at handoff
  • Financing, and quotes formatted for purchase orders
Lynkwell XLynk charger

Common questions

Before you add charging

Is there still a federal tax credit for chargers?

No. The federal 30C credit ended for charging equipment placed in service after June 30, 2026. State and utility programs are now where the funding is.

Do New York utilities still pay for make-ready work?

For cars and light trucks, the New York utility make-ready programs stopped taking new applications in April 2026. The medium- and heavy-duty fleet pilot is still open, and NYSERDA's Charge Ready NY 2.0 still offers Level 2 rebates.

Can programs be combined?

Often, yes. For example, MassEVIP can be combined with utility make-ready funding. Each program has its own rules, so we check how they stack for your site.

Will the charger qualify?

Most programs keep an approved equipment list. We confirm the charger you choose is on the list for each program before anything is ordered.

We are a public agency. How do we buy?

XLynk is available on NY State OGS contract PC70332, Sourcewell and the Purchasing Cooperative of America, and our quotes can be formatted for purchase orders.

How current is the incentive finder?

Programs open, close and change amounts often, so every result links to the official program page and shows the date we last checked. We confirm current availability before you commit.

Request a quote

Tell us about the site

Your utility, who will charge and how many ports. We check the incentives and quote the project as one number.

01Tell us the site, your utility and who will charge.
02We check the incentives and quote chargers and installation as one number.
03Our crews install, activate and hand off the site.

Interested in financing? Ask for payment options →

A photo of your electrical panel helps us size the job.

Request a charging quote

Your utility and site let us check incentives before we call.

We reply within one business day.

Call now Request a quote